System overview
Document: SDD-01
Status: Working draft
Date: 18 September 2026 (updated 3 October 2026)
1. Problem
Campuses need one digital operating surface for applicants, students, lecturers, and staff, while remaining inside existing CMS records, country ODL/QA evidence, and a tight delivery sequence. A student-facing frontend already exists as a demo. Applicant, lecturer, and staff surfaces, plus a live backend, do not.
2. System intent
Build role portals on top of the existing CMS, not a greenfield replacement of every legacy function.
This phase (confirmed 23 September 2026 — Aslam): the existing campus CMS family remains the system of record. Modern applicant / student / lecturer / staff experiences are delivered through the Portal API. Do not duplicate operational desks the old CMS already runs.
Pilot project — Lesotho (confirmed 3 October 2026 — Working
Group weekly / Read.ai): first launch / acceptance campus is
Lesotho, not Cyberjaya. Why: sponsor
Lesotho-first directive + weekly % progress; revenue / adoption
priority; must meet government requirements and match the campus’s
newer CMS; framed as a pilot with other campuses in parallel (Eswatini
may follow). Feature benchmark = newer Admin/Student CMS screenshots;
migration SoT = Raisd schema + Lesotho CMS materials (old dump
pending). Detail: docs/ai/architecture/lesotho-pilot.md
· analysis: docs/diagrams/old-cms-lesotho/.
Longer term: aim for a unified, one-stop CMS, delivered progressively — only when a gap is verified and a migration strategy (ownership, cutover, rollback, training) is agreed. That consolidation is backlog relative to Admissions launch and the Lesotho pilot; see SDD-03 M5+ and SDD-14.
Ideal end state (proposed): one Raisd CMS product
with distributed databases by country / region
(e.g. Lesotho, Malaysia, Singapore, Sierra Leone, Botswana), plus
white-labelling, feature toggles, and country-specific identity — not
one global student ledger. Diagram: docs/diagrams/distributed-cms-architecture.html.
Agent summary: docs/ai/architecture/distributed-cms-target.md.
Confirm as ADR before implementation.
flowchart LR
A[Applicant portal] --> P[Portal API]
S[Student portal] --> P
L[Lecturer portal] --> P
O[Admin / staff CMS] --> P
P --> C[Existing CMS<br/>system of record]
P --> F[Files / evidence store]
subgraph Shared
Auth[Auth and RBAC]
Ops[Monitoring backups security]
end
Auth --> A
Auth --> S
Auth --> L
Auth --> O
Four doors, one campus:
| Portal | Job |
|---|---|
| Applicant / online registration | Apply, upload evidence, track, accept enrolment |
| Student | Study, register, pay, receive results, get support |
| Lecturer | Publish materials, take attendance, mark, communicate |
| Admin / staff | Registry, Faculty, Bursary/Finance, QA, Marketing, remaining desks |
| Shared system | Integration, security, availability, training — mostly not screens |
3. Scope
In scope for this SDD set
- CAP-01 through CAP-55 as listed in SDD-11.
- Lesotho as first acceptance / pilot campus (3 Oct 2026).
- Phone-friendly core admissions and student journeys.
- Using the existing CMS family as the initial system of record.
Out of scope unless a later decision says otherwise
- Replacing working legacy staff functions that already satisfy a capability.
- Native mobile apps.
- Treating eight-country research domains as universal screen mandates.
- Inferring legal compliance from a frontend percentage.
4. Users and departments
| Actor | Typical department | Needs |
|---|---|---|
| Applicant | Registry / Marketing | Account, application, evidence, offer |
| Student | Registry, Faculty, Bursary, support desks | Records, learning, fees, services |
| Lecturer | Faculty | Class list, content, marking |
| Registry officer | Registry | Applications, student master, enrolment, results release |
| Faculty scheduler | Faculty | Classes, rooms, programme rules |
| Bursary / Finance | Bursary, Finance | Invoices, proof verification, reconciliation |
| QA | Quality Assurance | Approvals, materials readiness, evaluations |
| Marketing | Marketing | Applicant communications only; Registry owns formal decisions |
| IT / backend | TBC | Old CMS, Portal API, auth, ops |
Named next-action owners are TBC on every checklist row.
5. Current vs target
| Layer | Current (baseline 6811e88) |
This-phase Live target | Longer-term direction |
|---|---|---|---|
| Student UI | Demo / Partial / Placeholder on mock data | Role journeys on real CMS records via Portal API | Same journeys; SoR may migrate per verified gap |
| Applicant UI | No routes | Application-to-enrolment on CMS via Portal API | Unified admissions surface |
| Lecturer UI | No routes | Publish / attendance / marking — prefer verified old Lecturer Portal | Progressive lecturer workspace consolidation |
| Staff UI | No routes; do not rebuild what old CMS already does | Screens only for verified gaps; else old CMS desk | Progressive one-stop staff CMS |
| Backend | Replaceable contracts, mock runtime, CMS writes stubbed | Portal API ↔︎ existing campus CMS (CAP-53); Lesotho pilot first | Migration strategy per domain when retiring legacy |
| Mobile | Isolated Services tests only | Core journeys on phone widths | Unchanged principle |
| Auth | Fixed mock student session; logout no-op | Real login / SSO / provisioning honouring CMS rules where required | Campus-wide identity |
6. Design principles
- Existing CMS is source of truth for this phase until a later milestone proves a function should move — with an agreed migration strategy.
- Admissions before semester registration. Student v1 UI depth does not change that order.
- Demo is not done. A screen without durable save and server-enforced permission is not Live.
- Proof is not payment. Bank-transfer evidence stays unverified until Bursary allocates it.
- One CAP, many surfaces. Student “view timetable” and lecturer “record attendance” share CAP-11/12.
- Country evidence is confirmation work, not an automatic feature list.
- Build staff screens only for verified gaps in the old CMS; do not duplicate operational functions.
- Unified one-stop CMS is progressive backlog, not a mandate to rewrite working desks for M2–M4.
7. Campus footprint
First gate: Lesotho pilot acceptance (M4). Cyberjaya and other campuses expand under M5; a near-term Eswatini rollout may be proposed in parallel after Lesotho.
Evidence tab also covers Botswana, Cambodia, Eswatini, Lesotho, Malaysia, Namibia, Sierra Leone, and Uganda. Campus expansion never defers an applicable operating requirement if software is delayed — the campus must still run the process, on old CMS or manually, until the new surface is Live.